Art
J-GLOBAL ID:200902002039570780   Reference number:88A0599844

Construction of large-scale slope based on slope strengthening work method. Slope strengthening work using rock bolt and spray mortar.

斜面補強工による大規模法面の施工 ロックボルトと吹付モルタルによる斜面補強工
Author (5):
Material:
Volume: 43rd  Page: 202-203  Publication year: Oct. 1988 
JST Material Number: S0330B  Document type: Article
Article type: 短報  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=88A0599844&from=J-GLOBAL&jstjournalNo=S0330B") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Slope stability,deformation by excavating 

Return to Previous Page