Art
J-GLOBAL ID:200902015498724344   Reference number:90A0740273

Parts physical distribution control and integrated production control system that makes 24-hour-continuous supply of parts possible using S/88.

S/88による24時間連続部品供給を可能とした部品物流制御/生産管理統合システム
Author (2):
Material:
Volume: 28th  Page: 1-22  Publication year: May. 1990 
JST Material Number: S0095B  Document type: Proceedings
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=90A0740273&from=J-GLOBAL&jstjournalNo=S0095B") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Production engineering in general 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page