Art
J-GLOBAL ID:201702272552649947   Reference number:17A0018251

i-Constructionの推進と最新施工現場(新技術・新工法・新材料)【施工事例】ダム建設工事におけるCIM・ICT施工の取組み-大分川ダム建設工事-

Author (2):
Material:
Volume: 58  Issue:Page: 46-49  Publication year: Dec. 22, 2016 
JST Material Number: F0026A  ISSN: 0387-0790  Document type: Article
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (2):
JST classification
Category name(code) classified by JST.
Dams in general  ,  Construction management 

Return to Previous Page