T. Sonoda, M. Wada, M. Reponen, I. Katayama, V. Sonnenschein, M. Oohashi, H. Tomita, S. Nishimura, H. Iimura, TM Kojima, et al. The progress of on-line commissioning study on parasitic production of low-energy RI-beam system (PALIS) at BigRIPS. RIKEN Accelerator Progress Report. 2018. 51. 169
T. Sonoda, M. Wada, M. Reponen, I. Katayama, TM Kojima, H. Iimura, A. Deuk Soon, N. Fukuda, T. Kubo, K. Kusaka, et al. The first on-line commissioning study on parasitic production of low-energy RI-beam system (PALIS) at BigRIPS. RIKEN progress report. 2016. 49. 16