文献
J-GLOBAL ID:201702259309681538
整理番号:17A1503149
現在価値体積(PV V)の応用と採掘戦略選択のためのNPV累積全鉱石(NPV CTO)フラクタルモデリング【Powered by NICT】
Application of Present Value-Volume (PV-V) and NPV-Cumulative Total Ore (NPV-CTO) fractal modelling for mining strategy selection
著者 (4件):
Yasrebi Amir Bijan
(Department of Mining and Metallurgical Engineering, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran)
,
Yasrebi Amir Bijan
(Computational Geomechanics Group, College of Engineering, Mathematics and Physical Sciences, University of Exeter, Streatham Campus, Exeter, UK)
,
Hezarkhani Ardeshir
(Department of Mining and Metallurgical Engineering, Amirkabir University of Technology (Tehran Polytechnic), Tehran, Iran)
,
Afzal Peyman
(Department of Mining Engineering, South Tehran Branch, Islamic Azad University, Tehran, Iran)
資料名:
Resources Policy
(Resources Policy)
巻:
53
ページ:
384-393
発行年:
2017年
JST資料番号:
C0816B
ISSN:
0301-4207
資料種別:
逐次刊行物 (A)
記事区分:
原著論文
発行国:
オランダ (NLD)
言語:
英語 (EN)