文献
J-GLOBAL ID:201802229215819044
整理番号:18A0331733
洋上風力発電所における設備スケジューリングのための二目的最適化モデル【Powered by NICT】
Bi-objective optimisation model for installation scheduling in offshore wind farms
著者 (4件):
Irawan Chandra Ade
(Department of Mathematics, Centre for Operational Research and Logistics, University of Portsmouth, Lion Gate Building, Lion Terrace, Portsmouth PO1 3HF, UK)
,
Irawan Chandra Ade
(Department of Industrial Engineering, Institut Teknologi Nasional, Bandung 40124, Indonesia)
,
Jones Dylan
(Department of Mathematics, Centre for Operational Research and Logistics, University of Portsmouth, Lion Gate Building, Lion Terrace, Portsmouth PO1 3HF, UK)
,
Ouelhadj Djamila
(Department of Mathematics, Centre for Operational Research and Logistics, University of Portsmouth, Lion Gate Building, Lion Terrace, Portsmouth PO1 3HF, UK)
資料名:
Computers & Operations Research
(Computers & Operations Research)
巻:
78
ページ:
393-407
発行年:
2017年
JST資料番号:
H0216B
ISSN:
0305-0548
CODEN:
CMORAP
資料種別:
逐次刊行物 (A)
記事区分:
原著論文
発行国:
オランダ (NLD)
言語:
英語 (EN)