文献
J-GLOBAL ID:201802232361344713
整理番号:18A0430757
一時的な覆工と対応する対策を除去することにより誘起された変位増分の解析【Powered by NICT】
Analysis of the displacement increment induced by removing temporary linings and corresponding countermeasures
著者 (5件):
Zhang H.J.
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University, Chengdu, PR China)
,
Wang Z.Z.
(School of Civil Engineering, Dalian University of Technology, Dalian, PR China)
,
Lu F.
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University, Chengdu, PR China)
,
Xu G.Y.
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University, Chengdu, PR China)
,
Qiu W.G.
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, School of Civil Engineering, Southwest Jiaotong University, Chengdu, PR China)
資料名:
Tunnelling and Underground Space Technology
(Tunnelling and Underground Space Technology)
巻:
73
ページ:
236-243
発行年:
2018年
JST資料番号:
B0677C
ISSN:
0886-7798
資料種別:
逐次刊行物 (A)
記事区分:
原著論文
発行国:
オランダ (NLD)
言語:
英語 (EN)