文献
J-GLOBAL ID:201902214403278705
整理番号:19A2036143
セメント-ケイ酸ナトリウムグラウトの長期性能に関する研究とシールドトンネルの同時埋戻し注入におけるセグメントライニング構造に及ぼすその影響【JST・京大機械翻訳】
Study on the long-term performance of cement-sodium silicate grout and its impact on segment lining structure in synchronous backfill grouting of shield tunnels
著者 (4件):
Wang Shimin
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu, Sichuan 610031, China)
,
He Chuan
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu, Sichuan 610031, China)
,
Nie Liang
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu, Sichuan 610031, China)
,
Zhang Guangchao
(Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu, Sichuan 610031, China)
資料名:
Tunnelling and Underground Space Technology
(Tunnelling and Underground Space Technology)
巻:
92
ページ:
Null
発行年:
2019年
JST資料番号:
B0677C
ISSN:
0886-7798
資料種別:
逐次刊行物 (A)
記事区分:
原著論文
発行国:
オランダ (NLD)
言語:
英語 (EN)