文献
J-GLOBAL ID:202002282976340773
整理番号:20A1207785
製鋼連続鋳造生産のためのリリース時系列予測に基づくロバスト動的スケジューリング手法【JST・京大機械翻訳】
A robust dynamic scheduling approach based on release time series forecasting for the steelmaking-continuous casting production
著者 (6件):
Long Jianyu
(School of Mechanical Engineering, Dongguan University of Technology, Dongguan 523808, China)
,
Sun Zhenzhong
(School of Mechanical Engineering, Dongguan University of Technology, Dongguan 523808, China)
,
Pardalos Panos M.
(Center for Applied Optimization, Department of Industrial and Systems Engineering, University of Florida, Gainesville, FL 32611, USA)
,
Bai Yun
(School of Mechanical Engineering, Dongguan University of Technology, Dongguan 523808, China)
,
Zhang Shaohui
(School of Mechanical Engineering, Dongguan University of Technology, Dongguan 523808, China)
,
Li Chuan
(School of Mechanical Engineering, Dongguan University of Technology, Dongguan 523808, China)
資料名:
Applied Soft Computing
(Applied Soft Computing)
巻:
92
ページ:
Null
発行年:
2020年
JST資料番号:
W2175A
ISSN:
1568-4946
資料種別:
逐次刊行物 (A)
記事区分:
原著論文
発行国:
オランダ (NLD)
言語:
英語 (EN)