(2) C.-H. Hsieh: “Grey Neural Network and Its Application to Short Term Load Forecasting Problem”, IEICE Trans. Inf. Syst., Vol. E85-D, No. 5, pp. 897-902 (2002)
(3) H. Mori, N. Kosemura, K. Ishiguro, and T. Kondo: “Short-term Load Forecasting with Fuzzy Regression Tree in Power Systems”, Proc. IEEE, Vol. 2001, No. 3, pp. 1948-1953 (2001)
(4) T. Senjyu, H. Takara, K. Uezato, and T. Funabashi: “One-Hour- Ahead Load Forecasting Using Neural Network”, IEEE Trans. Power Syst., Vol. 17, No. 1, pp. 113-118 (2002)
(5) T. Yosida, H. Kita, H. Tanaka, Z. Hasegawa, and A. Toyama: “Studies on Operation and Control of Non-Utility Generation Facility Considering Demand Contract”, T. IEE Japan, Vol. 121, No. 12, pp. 1699-1707 (2001-12) (in Japanese)