(1) Technical Report of the Institute of Electrical Engineers of Japan: “LFC on the Electric Power System in the Regular Time and in an Emergency”, Technical Report IEE Japan, No. 869, pp. 133-141 (2002) (in Japanese)
調査専門委員会:「電力系統における常時及び緊急時の負荷周波数制御」, 電気学会技術報告, No. 869, pp. 133-141 (2002)
(2) Y. Kojima, S. Nakamura, K. Abe, O. Takahashi, E. Tsukada, and T. Kurokawa: “Development of EDC considering Cooperation with AFC”, The Papers of Technical Meeting on Power Engineering and Power Systems Engineering, IEE Japan, PE03-35, pp. 19-24 (2003) (in Japanese)
小島康弘·中村静香·阿部公哉·高橋 修·塚田英一·黒川隆久: 「AFCとの協調制御を考慮したEDCの実運用化」, 電気学会電力技術·電力系統技術合同研資, PE03-35, pp. 19-24 (2003)
(3) Y. Honda, K. Enomoto, H. Tanimoto, and K. Yoshida: “The development of Automatic Generation Control System”, The Papers of Technical Meeting on Power Engineering and Power Systems Engineering, IEE Japan, PE02-173, pp. 43-48 (2002) (in Japanese)