Art
J-GLOBAL ID:200902001867015890   Reference number:88A0024696

Reducerea duratei de realizare a investitiilor la putul cu schip Valea de Brazi prin tehnologia de translatare a turnului definitiv de extractie.

本格的な巻上やぐらの移動によるValea de Braziスキップ立坑設備の建設期間の短縮
Author (3):
Material:
Volume: 38  Issue: 10  Page: 459-463  Publication year: Oct. 1987 
JST Material Number: E0204B  Document type: Article
Article type: 解説  Country of issue: Romania (ROU)  Language: ROMANIAN,RUMANIAN (RO)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=88A0024696&from=J-GLOBAL&jstjournalNo=E0204B") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Mine facilities in general  ,  Underground transportation 
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page