Art
J-GLOBAL ID:200902065871628323   Reference number:90A0513624

Sewerage artery in the eastern basin of Juefukigawa River.Construction works.Shield 3 sections of construction.Report of construction works by pressurized slurry shield tunneling method.

峡東流域下水道笛吹川幹線(シールド3工区)建設工事 加泥式シールド工法施工報告
Author (1):
Material:
Volume: 7th  Page: 63-90  Publication year: Nov. 1988 
JST Material Number: X0470A  Document type: Proceedings
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=90A0513624&from=J-GLOBAL&jstjournalNo=X0470A") }}
JST classification (4):
JST classification
Category name(code) classified by JST.
Muck disposal,timbering,lining  ,  沈埋工法,シールド工法など,及びその機械・設備【’81~’92】  ,  Piping design and work  ,  Sewerage,sewers attached facilities 

Return to Previous Page