Art
J-GLOBAL ID:200902070118041011   Reference number:93A0026780

An Application of Expert System to Real-time Production Scheduling in Assembly Line.

組立工程リアルタイム生産指示へのエキスパートシステムの適用
Author (2):
Material:
Volume: 2nd  Page: 163-166  Publication year: Oct. 1992 
JST Material Number: L1193A  Document type: Proceedings
Article type: 短報  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=93A0026780&from=J-GLOBAL&jstjournalNo=L1193A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Assembly of machines  ,  Artificial intelligence 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page