Art
J-GLOBAL ID:200902092431223817   Reference number:92A0004362

Development of a front monitoring system for tunnel construction. (No.1) Experimental studies on monitoring obstacles in front of a shield tunneling machine using an acoutstic wave and Rayleigh wave.

地中前方探査技術の開発 (その1)音波・レーリー波を用いたシールド機の前方探査に関する実験的研究
Author (3):
Material:
Volume: 1991  Page: 131-141  Publication year: Nov. 1991 
JST Material Number: S0160A  ISSN: 0385-7123  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=92A0004362&from=J-GLOBAL&jstjournalNo=S0160A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
沈埋工法,シールド工法など,及びその機械・設備【’81~’92】  ,  Geophysical and geological exploration in general 

Return to Previous Page