Art
J-GLOBAL ID:200902103184284591   Reference number:93A0498728

Minimizing total completion time on a batch processing machine with job families.

ジョブファミリを伴うバッチ処理機械の総完了時間の最小化
Author (3):
Material:
Volume: 13  Issue:Page: 61-65  Publication year: Mar. 1993 
JST Material Number: H0832A  ISSN: 0167-6377  CODEN: ORLED5  Document type: Article
Article type: 原著論文  Country of issue: Netherlands (NLD)  Language: ENGLISH (EN)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=93A0498728&from=J-GLOBAL&jstjournalNo=H0832A") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Process control 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page