Art
J-GLOBAL ID:200902109974222160   Reference number:98A0592769

A branch and bound algorithm for the resource-constrained project scheduling problem.

資源制約付きプロジェクト・スケジューリング問題に対する分枝限定アルゴリズム
Author (4):
Material:
Volume: 107  Issue:Page: 272-288  Publication year: Jun. 01, 1998 
JST Material Number: A0547A  ISSN: 0377-2217  Document type: Article
Article type: 原著論文  Country of issue: Netherlands (NLD)  Language: ENGLISH (EN)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=98A0592769&from=J-GLOBAL&jstjournalNo=A0547A") }}
JST classification (3):
JST classification
Category name(code) classified by JST.
Network methods  ,  Process control  ,  System optimization methods 
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page