Art
J-GLOBAL ID:200902136293532231   Reference number:94A0823760

Trands of R&D on Short-Term Load Forecasting.

電力の翌日最大需要予測システムの研究開発動向
Author (2):
Material:
Volume: 114  Issue:Page: 835-838  Publication year: Sep. 1994 
JST Material Number: S0809A  ISSN: 0385-4213  Document type: Article
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=94A0823760&from=J-GLOBAL&jstjournalNo=S0809A") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Electric power engineering and electric enterprise in general 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page