Art
J-GLOBAL ID:200902139015319054   Reference number:99A0104124

Resource-constrained project scheduling: Notation, classification, models, and methods.

資源制約付きプロジェクト・スケジューリング 記法,分類,モデル,方法
Author (5):
Material:
Volume: 112  Issue:Page: 3-41  Publication year: Jan. 01, 1999 
JST Material Number: A0547A  ISSN: 0377-2217  Document type: Article
Article type: 文献レビュー  Country of issue: Netherlands (NLD)  Language: ENGLISH (EN)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=99A0104124&from=J-GLOBAL&jstjournalNo=A0547A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Network methods  ,  Theory of computation 

Return to Previous Page