Art
J-GLOBAL ID:200902141376136897   Reference number:00A0615259

A Study of Scheduling and Availability Considering 2nd-Stage Setup Performed in Parallel with Pre-Stage Machining in a 2-Stage Flow Shop.

前加工工程の加工と並列遂行可能な後工程の段取作業を考慮した2段階フローショップ型のスケジューリング法とその有効性に関する研究
Author (3):
Material:
Volume: 51  Issue:Page: 108-114  Publication year: Jun. 15, 2000 
JST Material Number: F0241B  ISSN: 1342-2618  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=00A0615259&from=J-GLOBAL&jstjournalNo=F0241B") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Production process 
Reference (6):
  • MUTH, J. F. Industrial Scheduling. 1963, 13-20
  • 関根智明監訳. スケジューリングの理論. 1971, 113-147
  • HEIZER, J. Production and Operations Management. 1993, 650-660
  • 人見勝人. 新・生産管理工学-理論・アルゴリズム・例解-. 1997, 135-163
  • 村松林太郎. 新版 生産管理の基礎. 1979, 59-300
more...

Return to Previous Page