Art
J-GLOBAL ID:200902162062903351   Reference number:02A0786804

Cast-in-place Piling as Preventive Measures against Mud Boiling & track bed Settlement. Shirasaka Tunnel on Touhoku Shinkansen Line.

トンネル内噴泥・路盤沈下対策に場所打ち杭を採用 東北新幹線 白坂トンネル
Author (4):
Material:
Volume: 33  Issue: 10  Page: 799-809  Publication year: Oct. 01, 2002 
JST Material Number: S0644A  ISSN: 0285-631X  Document type: Article
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=02A0786804&from=J-GLOBAL&jstjournalNo=S0644A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Tunneling work  ,  Track structure,track materials 

Return to Previous Page