Art
J-GLOBAL ID:200902172090547396   Reference number:98A0466862

A Study on Outage Work Scheduling by Using Hypothesis-based Reasoning.

仮説推論を用いた停電作業スケジューリングに関する一考察
Author (5):
Material:
Volume: 118-B  Issue:Page: 460-466  Publication year: Apr. 1998 
JST Material Number: S0809A  ISSN: 0385-4213  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=98A0466862&from=J-GLOBAL&jstjournalNo=S0809A") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Electric power system in general 
Reference (6):
more...
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page