Art
J-GLOBAL ID:200902189852779494   Reference number:94A0700583

Reducing Method of the Scheduling Model Size for Multi-Stage Process. Scheduling under the Constraints of the Processing Time and Capacity at the Succeeding Stations. Part II.

多段工程スケジューリングの問題縮約法 後工程の使用時間及び容量の制約をもつスケジューリング 第2報
Author (3):
Material:
Volume: 45  Issue:Page: 264-269  Publication year: Aug. 1994 
JST Material Number: F0241B  ISSN: 0386-4812  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=94A0700583&from=J-GLOBAL&jstjournalNo=F0241B") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Process control 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page