Art
J-GLOBAL ID:200902189864835233   Reference number:99A0913163

Parallel Machine Scheduling Problem with a Non-Regular Objective Function. Minimizing the Sum of Earliness and Tardiness Penalties.

非正規目的関数のもとでの並列機械スケジューリング問題 重みつき納期ずれ和の最小化
Author (3):
Material:
Volume: 35  Issue:Page: 1176-1182  Publication year: Sep. 30, 1999 
JST Material Number: S0104A  ISSN: 0453-4654  CODEN: KJSRA  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=99A0913163&from=J-GLOBAL&jstjournalNo=S0104A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Process control  ,  Network methods 
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page