Art
J-GLOBAL ID:200902199539730463   Reference number:01A0812800

Cyclic scheduling heuristics for a re-entrant job shop manufacturing environment.

凹型作業現場環境向けの周期型生産計画の発見的方法
Author (2):
Material:
Volume: 39  Issue: 12  Page: 2635-2657  Publication year: Aug. 15, 2001 
JST Material Number: E0521A  ISSN: 0020-7543  CODEN: IJPRB  Document type: Article
Article type: 原著論文  Country of issue: United Kingdom (GBR)  Language: ENGLISH (EN)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=01A0812800&from=J-GLOBAL&jstjournalNo=E0521A") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Process control 
Terms in the title (6):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page