Point-Cloud-Based Comparison between Construction Schedule and As-Built Progress: Long-Range Three-Dimensional Laser Scanner’s Approach

建設のスケジュールと実際の進行との間のポイント-クラウドに基づいた比較:広域三次元レーザスキャナによるアプローチ
Author (2):
Material:
Volume: 10  Issue:Page: 98-102  Publication year: Sep. 2004 
JST Material Number: W0747A  ISSN: 1076-0431  CODEN: JAEIED  Document type: Article
Article type: 原著論文  Country of issue: United States (USA)  Language: ENGLISH (EN)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=04A0645045&from=J-GLOBAL&jstjournalNo=W0747A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Construction management  ,  Process control 

Return to Previous Page