Art
J-GLOBAL ID:201002048243768140   Reference number:80A0190511

On the optimal allocation of work in symmetrically unbalanced production line systems with variable operation times.

対称的にアンバランスされた不定作業時間生産ラインでの仕事の最適割当て
Author (2):
Material:
Volume: 25  Issue:Page: 721-728  Publication year: 1979 
JST Material Number: E0196A  ISSN: 0025-1909  CODEN: MSCIA  Document type: Article
Article type: 原著論文  Country of issue: United States (USA)  Language: ENGLISH (EN)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=80A0190511&from=J-GLOBAL&jstjournalNo=E0196A") }}
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page