Art
J-GLOBAL ID:201202264957110252   Reference number:12A0969773

組織と危機管理 リスク認知のバイアス-なぜリスクが過小評価されるのか-

Author (1):
Material:
Volume: 45  Issue:Page: 56-65  Publication year: Jun. 20, 2012 
JST Material Number: G0726A  ISSN: 0286-9713  Document type: Article
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=12A0969773&from=J-GLOBAL&jstjournalNo=G0726A") }}
JST classification (2):
JST classification
Category name(code) classified by JST.
Management engineering in general  ,  Applied psychology 
Reference (18):
more...

Return to Previous Page