Art
J-GLOBAL ID:201402200471713440   Reference number:14A0763128

STATISTICAL ANALYSIS OF THE COMPREHENSIVE EVALUATION BIDDING METHOD

総合評価落札方式の実態に関する統計分析-入札参加者間の技術評価点及び応札価格の差に着目して-
Author (3):
Material:
Volume: 68  Issue:Page: I.193-I.199 (J-STAGE)  Publication year: 2012 
JST Material Number: U0303A  ISSN: 2185-6605  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (1):
JST classification
Category name(code) classified by JST.
Construction work in general 
Reference (5):
  • 1) 国土交通省国土技術政策総合研究所総合技術政策研究センター建設マネジメント技術研究室:国土交通省直轄工事における総合評価方式の変遷について,建設マネジメント技術,平成24年5月号,pp. 7-11,2012.
  • 2) 例えば日経コンストラクション 2012年4月23日号.
  • 3) 岩松準・秋山哲一・遠藤和義:建設プロジェクトにおける入札戦略に関する研究,日本建築学会計画系論文集,第548号,pp. 207-213,2001.
  • 4) 森本恵美・滑川達・山中英生:公開入札結果情報を用いた入札競争状態の統計分析,建設マネジメント研究論文集,Vol. 12,pp. 139-148,2005.
  • 5) 金子雄一郎・本橋純・島崎敏一:公開入札情報を用いた総合評価方式の実態分析,建設マネジメント研究論文集,Vol. 15,pp. 273-280,2008.

Return to Previous Page