Art
J-GLOBAL ID:201502219524946442   Reference number:15A1367822

Transportation Method for High-Speed Construction of Large Concrete Dams

大型コンクリートダムの高速施工に対応する運搬方法
Author (4):
Material:
Volume: 53  Issue: 12  Page: 1051-1057  Publication year: Dec. 01, 2015 
JST Material Number: S0301A  ISSN: 0387-1061  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (2):
JST classification
Category name(code) classified by JST.
Dams in general  ,  Concrete work 
Reference (10):
  • 1) 國分正胤:日本におけるRCD工法によるコンクリートダム施工法の開発,ダム技術,Vol.3,増刊 1,pp.1~15,1985
  • 2) 広瀬利雄・志水茂明・竹村公太郎:R. C. D.(Roller Compacted Dam)コンクリート工法によるダムの施工に関する研究,土木学会論文報告集,Vol.303,pp.93~108,1980
  • 3) (一財)ダム技術センター:多目的ダムの建設,第6巻,施工編,pp.52~86,2005
  • 4) (財)日本ダム協会:コンクリートダムの施工,pp.24~43,2008
  • 5) 野口昌紘・田代民治・五味篤暁:「ダム堤体情報化設計施工CADシステム」の開発,電力土木,No.241,pp.109~112,1992. 9
more...
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page