Art
J-GLOBAL ID:201502221946839669   Reference number:15A0358471

MAINTENANCE PLANNING IN CONSIDERATION OF CHANGE OF SCHEDULE IN BRIDGES ASSET MANAGEMENT

橋梁群のアセットマネジメントにおける予定の変更を考慮した補修計画策定
Author (6):
Material:
Volume: 70  Issue:Page: I.959-I.970 (J-STAGE)  Publication year: 2014 
JST Material Number: U0102B  ISSN: 2185-4661  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (1):
JST classification
Category name(code) classified by JST.
Failure and maintenance of bridges,and others 
Reference (11):
Terms in the title (5):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page