Art
J-GLOBAL ID:201502232357652623   Reference number:15A0584851

On-Going Commissioning of HVAC System with a Seasonal Ground Thermal Storage Using Simulation: Part 2-Performance Verification and Optimization Process for Three Years after the Completion of Construction

季間蓄熱機能を有する空調システムのシミュレーションを利用したコミッショニング 第2報-運用開始後3年間に亘る運転最適化プロセス
Author (9):
Material:
Issue: 218  Page: 19-29  Publication year: May. 05, 2015 
JST Material Number: G0149B  ISSN: 0385-275X  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (6):
JST classification
Category name(code) classified by JST.
Air conditioning equipment in general  ,  Operations research in general  ,  System optimization methods  ,  System design and analysis  ,  Energy storage  ,  Reliability 
Reference (8):

Return to Previous Page