Art
J-GLOBAL ID:201602000178573419   Reference number:58A0017193

Fuer die Einfuehrung einer Organisation der Produktion nach dem teohnologischen Ablauf im Sehiffbau.

造船工業に生産機構を導入するために(造船業において造船の工学的仕事を終えるまでの生座組織を立てること)
Author (1):
Material:
Volume:Issue:Page: 157-162  Publication year: 1958 
JST Material Number: E0066A  Document type: Article
Country of issue: German Democratic Republic (DDR) 
JST classification (2):
JST classification
Category name(code) classified by JST.
Terms in the title (6):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page