Art
J-GLOBAL ID:201602011588823392 Reference number:58A0076664
Third Longest Steel Cantilever Bridge at New Orleans.
ニューオリアンズの3番目に長いゲルバー鉄橋(コンクリートスラブを平衡力に使った不均等構造)
Publisher site
Copy service
Access JDreamⅢ for advanced search and analysis.
Material:
Highw Bridges Eng Works (Highways and Bridges and Engineering Works)
About Highw Bridges Eng Works
Search "C0115A"
Search ISSN,ISBN,CODEN
Detailed information
Volume:
26
Issue:
1232
Page:
8
Publication year:
1958
JST Material Number:
C0115A
ISSN:
0142-6168
Document type:
Article
Country of issue:
United Kingdom (GBR)
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.
ゲル
About ゲル
Search "ゲル"
Detailed information
,
コンクリートスラブ
About コンクリートスラブ
Search "コンクリートスラブ"
Detailed information
,
平衡
About 平衡
Search "平衡"
Detailed information
,
不均等
About 不均等
Search "不均等"
Detailed information
Return to Previous Page
TOP
BOTTOM