Art
J-GLOBAL ID:201602016890525149   Reference number:73A0351998

Montage-Mechanisierung-wie ist bei der Planu-ng vorzugehen?

組立作業の機械化計画の最適化
Author (1):
Material:
Volume: 42  Issue:Page: 239-244  Publication year: 1973 
JST Material Number: C0561A  CODEN: INORA   Document type: Article
Article type: 解説  Country of issue: Switzerland (CHE)  Language: GERMAN (DE)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page