Art
J-GLOBAL ID:201602020201182881   Reference number:58A0075652

Concrete set slowed down to step up bridge construction.

ポストテンション工法によるWolcottプレストレストコンクリート道路橋建設記録
Author (2):
Material:
Volume: 23  Issue:Page: 37-41  Publication year: 1958 
JST Material Number: B0282A  ISSN: 0009-7853  CODEN: CVEGA   Document type: Article
Country of issue: United States (USA) 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page