Art
J-GLOBAL ID:201602020458218836 Reference number:58A0077753
Roadbuilder Shoots for Early Completion.
機械力の適当な活用によって工期の短縮を計りうる道路建設工事
Publisher site
Copy service
Access JDreamⅢ for advanced search and analysis.
Material:
Constr Methods Equip (Construction Methods and Equipment)
About Constr Methods Equip
Search "B0310A"
Search ISSN,ISBN,CODEN
Detailed information
Volume:
40
Issue:
5
Page:
152-154
Publication year:
1958
JST Material Number:
B0310A
ISSN:
0010-6844
CODEN:
CMEQA
Document type:
Article
Country of issue:
United States (USA)
JST classification (2):
JST classification
Category name(code) classified by JST.
(AC080105)
Search "AC080105"
Search "AC08"
,
(AC090104)
Search "AC090104"
Search "AC09"
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.
活用
About 活用
Search "活用"
Detailed information
,
工期
About 工期
Search "工期"
Detailed information
,
道路建設
About 道路建設
Search "道路建設"
Detailed information
,
工事
About 工事
Search "工事"
Detailed information
Return to Previous Page
TOP
BOTTOM