Art
J-GLOBAL ID:201702244038070388   Reference number:17A1791449

Construction Techniques of Pre-grouting in Tertiary of Rich-water Sand-shale in Shuangfeng Tunnel on Mudanjiang-Suifenhe Railway

第二紀におけるShengdong鉄道におけるShengfengトンネルにおける第三紀砂-泥岩地層の超前注入工法に関する強化技術を研究した。【JST・京大機械翻訳】
Author (4):
Material:
Volume: 61  Issue:Page: 125-130  Publication year: 2017 
JST Material Number: C3752A  ISSN: 1004-2954  Document type: Article
Article type: 原著論文  Country of issue: China (CHN)  Language: CHINESE (ZH)
Abstract/Point:
Abstract/Point
Japanese summary of the article(about several hundred characters).
All summary is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
Shuangfeng Tunnel is the longe...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=17A1791449&from=J-GLOBAL&jstjournalNo=C3752A") }}
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
, 【Automatic Indexing@JST】
Author keywords (5):
JST classification (3):
JST classification
Category name(code) classified by JST.
Tunneling work  ,  Radioactive wastes  ,  Mechanical properties of rocks 

Return to Previous Page