Art
J-GLOBAL ID:201702258347531067   Reference number:17A0127231

再生可能エネルギー大量導入時の発電機起動停止計画における起動台数のとりうる範囲と需給バランスの関係

Author (5):
Material:
Volume: 136  Issue: 11  Page: 809-816(J-STAGE)  Publication year: 2016 
JST Material Number: S0809A  ISSN: 0385-4213  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (1):
JST classification
Category name(code) classified by JST.
Electric power system in general 
Reference (11):
  • (1) 電気学会:「電力系統の需給制御技術」, 電気学会技術報告(II), No. 302 (1989)
  • (2) California ISO: “MRTU Market Elements Demand Response”, http://www.caiso.com/Documents/Presentation-MRTUMarketOverviewandTimeline.pdf
  • (3) T. Masuta, T. Oozeki, J. G. S. Fonseca, Jr., and A. Murata: “Evaluation of Outage and Surplus Power due to Forecast Error of Photovoltaic Generation Output”, IEEJ Trans. PE, Vol. 131, No. 4, pp. 286-295 (2014) (in Japanese)
  • 益田泰輔・大関 崇・Joao Gari da Silva Fonseca Junior・村田晃伸:「太陽光発電予測誤差が原因となる供給支障電力と余剰電力の評価」, 電学論B, Vol. 134, No. 4, pp. 286-295 (2014)
  • (4) 東北電力プレスリリース:西仙台変電所の大型蓄電池システムの営業運転開始について (2015)
more...
Terms in the title (5):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page