Art
J-GLOBAL ID:201702283597170493   Reference number:17A1837350

Method for Setting Boundary Condition in Energy Management by using System Simulation: Part 1-Method for Setting Primary Equipment Load in the Design and Operational Phases

シミュレーションを活用したエネルギーマネジメントにおける境界条件データの設定方法に関する研究 第1報-設計段階・運用段階における熱源負荷の設定方法
Author (13):
Material:
Issue: 249  Page: 13-22  Publication year: Dec. 05, 2017 
JST Material Number: G0149B  ISSN: 0385-275X  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (2):
JST classification
Category name(code) classified by JST.
Air conditioning equipment in general  ,  Air conditioning in general 
Reference (9):
  • 1) 渡邊 剛・坂井友香・尹奎英・丹羽英治・時田 繁・奥宮正哉:建築設備のライフサイクルマネジメントにおけるシステムシミュレーションの活用に関する研究(第2報)BEMS とシミュレーションを利用した空調システムのエネルギーマネジメント, 空気調和・衛生工学会論文集, No163(2010-10), pp.29-37
  • 2) 塚原啓司・岡垣 晃:東京スカイツリータウンにおける省CO2対策, 電気設備学会誌, Vol. 32, No. 10 (2012), pp.749-752
  • 3) LCEM ツールver3.10:技術解説書主要オブジェクトの計算アルゴリズム【中央熱源空調編】、国土交通省大臣官房庁営繕部設備・環境課(平成26年-2月)
  • 4) (一財)省エネルギーセンター, オフィスビルの省エネルギー(パンフレット), 2009, p.3-5
  • 5) (一社)公共建築設協会,建築設備設計基準, 平成27年版
more...

Return to Previous Page