Art
J-GLOBAL ID:201802213511545705   Reference number:18A1420609

Road Tunnel Newly Constructed Under Grade-Separated Crossing of Highway and Railroad Using the HEP & JES Method-The Tokyo Prefectural Road Ishikawa Utsuki Line-

高速道路と立体交差する線路直下にHEP&JES工法で道路を新設-都道石川宇津木線-
Author (4):
Material:
Volume: 49  Issue:Page: 583-589  Publication year: Aug. 01, 2018 
JST Material Number: S0644A  ISSN: 0285-631X  Document type: Article
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (1):
JST classification
Category name(code) classified by JST.
Tunneling work 
Reference (4):
  • 近接施工技術総覧編集委員会:近接施工技術総覧,pp.59-64,1997.3.
  • 日本道路公団大阪管理局委託:高速道路の近接施工に関する研究(その2),1986.
  • 高速道路技術センター:開削工法(直接基礎工)の近接程度の範囲,1987.2.
  • 東日本旅客鉄道:非開削工法設計施工マニュアル,IV地下・トンネル構造物編,設計マニュアル,p.9-2,2017.3.

Return to Previous Page