Art
J-GLOBAL ID:201802216494032899   Reference number:18A0454556

1909 Active Schedule Generation Algorithm that Makes Decisions According to Time Progress

時間進行に従って意思決定をするアクティブスケジュール生成アルゴリズム
Author (5):
Material:
Volume: 2015.8  Page: _1909-1_-_1909-4_(J-STAGE)  Publication year: 2015 
JST Material Number: U1247A  ISSN: 2424-3086  Document type: Proceedings
Country of issue: Japan (JPN)  Language: ENGLISH (EN)
Abstract/Point:
Abstract/Point
Japanese summary of the article(about several hundred characters).
All summary is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
This paper deals with the opti...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=18A0454556&from=J-GLOBAL&jstjournalNo=U1247A") }}
Author keywords (4):
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page