Art
J-GLOBAL ID:201802231268964409   Reference number:18A0736221

Scheduling software for IT project considering trade off of delivery time, cost and duplicated tasks

納期,要員の重複タスク日数,コストのトレードオフを考慮したITプロジェクトスケジュールの自動生成ソフトウェア
Author (3):
Material:
Volume: 31st  Page: ROMBUNNO.2510  Publication year: Mar. 08, 2018 
JST Material Number: F1839A  Document type: Proceedings
Article type: 短報  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (1):
JST classification
Category name(code) classified by JST.
Management engineering in general 

Return to Previous Page