Art
J-GLOBAL ID:201802257964701339   Reference number:18A0012236

IT project scheduling based on a multi-objective genetic algorithm with fast convergence to Pareto front by an improved initial population strategy

初期集団の改良によりパレートフロントへの収束性を高めた多目的遺伝的アルゴリズムによるITプロジェクトスケジューリング
Author (3):
Material:
Volume: 2017  Issue: MPS-116  Page: Vol.2017-MPS-116,No.5,1-6 (WEB ONLY)  Publication year: Dec. 04, 2017 
JST Material Number: U0451A  Document type: Proceedings
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (2):
JST classification
Category name(code) classified by JST.
Computer system development  ,  Mathematical programmings 
Reference (10):
  • 日経BP社:第2回 プロジェクト実態調査 ,日経コンピュータ,2008年12月1日号, pp.38-49 (2008).
  • 布川 薫:重要性増すモダンPMそのシステム開発での実践体系を知る,日経ITプロフェッショナル, 2002年7月号, pp.152-157 (2002).
  • 初田 賢司,神子 秀雄:思い込みや楽観的な予測を排除緻密な WBS 定義こそが重要-作業計画とスケジュール作成の実践知識特集 1 進ちょく管理の大本命 EVM を極第2部 作業計画とスケジュール作成の実践, 日経 IT プロフェッショナル, 2004年12月号, pp.42-47 (2004).
  • Madjid Tavana, Amir-Reza Abtahi , Kaveh Khalili-Damghani : A new multi-objective multi-mode model for solving preemptive time-cost-quality trade-off project scheduling problems, Expert Systems with Applications, Vol.41, pp.1830-1846 (2014).
  • 佐藤 寛之,石渕 久生:進化型多数目的最適化の現状と課題, オペレーションズ・リサーチ: 経営の科学, Vol.62, No.3, pp.156-163 (2017).
more...

Return to Previous Page