Art
J-GLOBAL ID:201802282581091473   Reference number:18A1048667

Structure of Maintenance Work Process based on the PDCA Cycle at a Large-Scale R&D building (Part3) Relationship between the Structure of Maintenance Work Process and the Time to Repair

大規模研究所の保全業務を対象としたPDCAサイクルに基づく作業プロセスの構造の分析(その3)保全作業プロセスの構造と修復日数との関係性
Author (3):
Material:
Volume: 2017  Page: ROMBUNNO.H-38  Publication year: Aug. 31, 2017 
JST Material Number: F0023C  ISSN: 1880-3806  Document type: Proceedings
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (2):
JST classification
Category name(code) classified by JST.
Maintenence and management of buildings  ,  Educational facilities,cultural facilities,religious buildings 

Return to Previous Page