Art
J-GLOBAL ID:202002225752911079   Reference number:20A2596486

Construction Method of Steel Ring Reinforcement for Damaged Tunnel Based on Subway Suspension

地下鉄停止に基づく損傷トンネル鋼リング補強工法【JST・京大機械翻訳】
Author (1):
Material:
Volume: 42  Issue:Page: 1742-1743  Publication year: 2020 
JST Material Number: C4206A  ISSN: 1004-1001  Document type: Article
Article type: 原著論文  Country of issue: China (CHN)  Language: CHINESE (ZH)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
, 【Automatic Indexing@JST】
JST classification (4):
JST classification
Category name(code) classified by JST.
Tunnel maintenance and incidental equipment,and others  ,  Junneling engineering in general  ,  Railway facilities and construction in general  ,  Muck disposal,timbering,lining 
Terms in the title (4):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page