Art
J-GLOBAL ID:202002261409971338   Reference number:20A0799485

Building of Skew Steel Supports at Portal Under Asymmetric Earth Pressure Using Unmanned Face Building Robot-The Prefectural Road Yoshimada-Takine Line, the Hirose Ichi-Go Tunnel-

偏圧地形坑口の斜め支保工を切羽無人化建込みロボットで施工-県道吉間田滝根線 広瀬1号トンネル-
Author (4):
Material:
Volume: 51  Issue:Page: 305-314  Publication year: Apr. 01, 2020 
JST Material Number: S0644A  ISSN: 0285-631X  Document type: Article
Article type: 解説  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (1):
JST classification
Category name(code) classified by JST.
Tunneling work 
Reference (5):
  • 労働安全衛生総合研究所:トンネルの切羽からの肌落ちによる労働災害の調査分析と防止対策の提案, pp.4-8, 2012.3.
  • 厚生労働省:山岳トンネル工事の切羽における肌落ち災害防止対策に係るガイドライン,pp.1-5,2018.1.
  • 日本道路協会:道路トンネル技術基準(構造編)・同解説,pp.125-128,2003.12.
  • 土木学会:2016年制定 トンネル標準示方書,2016.
  • 東・中・西日本高速道路:設計要領 第三集,pp.456-61, 2016.8.

Return to Previous Page