Art
J-GLOBAL ID:200902118366554052   Reference number:95A0911375

Studies on Back Ground Data Prepared and Examined for Design for Hot water Supply Systems. Investigation on Water Temperature. (Part 1).

給湯設備設計用基礎データの検討・整備に関する研究 第1報 給水温に関する調査 (その1)
Author (9):
Material:
Volume: 1995  Issue: Pt 2  Page: 873-876  Publication year: Sep. 1995 
JST Material Number: F0023B  ISSN: 1880-3806  Document type: Proceedings
Article type: 短報  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=95A0911375&from=J-GLOBAL&jstjournalNo=F0023B") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Water supply,drainage and sanitary equipment in buildings 
Reference (2):
  • 住宅・建築 省エネルギー機構. 建築物の省エネルギー基準と計算の手引. 1993
  • 日本コージェネレーション研究会. コージェネレーション負荷推計手法. 1989

Return to Previous Page