Art
J-GLOBAL ID:200902138521372013   Reference number:97A0724943

Studies on Back Ground Date Prepared and Examined for Design for Hot Water Supply Systems. Part 3 Investigation on Water Temperature(Part 2).

給湯設備設計用基礎データの検討・整備に関する研究 第3報 給水温に関する調査(その2)
Author (9):
Material:
Volume: 1996  Issue: Pt 1  Page: 485-488  Publication year: Sep. 1996 
JST Material Number: F0023B  ISSN: 1880-3806  Document type: Proceedings
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.
,...
Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

   To see more with JDream III (charged).   {{ this.onShowAbsJLink("http://jdream3.com/lp/jglobal/index.html?docNo=97A0724943&from=J-GLOBAL&jstjournalNo=F0023B") }}
JST classification (1):
JST classification
Category name(code) classified by JST.
Water supply,drainage and sanitary equipment in buildings 

Return to Previous Page