Art
J-GLOBAL ID:201602215156183370   Reference number:16A0099696

WEEKLY PRODUCTION PLANNING ON THE BASIS OF AVERAGE VALUE-AT-RISK: A GAME THEORY APPROACH

AVaRに基づいた週間生産計画法の提案-ゲーム理論的アプローチ-
Author (3):
Material:
Volume: 58  Page: 101-121  Publication year: Dec. 2015 
JST Material Number: L5172A  ISSN: 1349-8940  Document type: Article
Article type: 原著論文  Country of issue: Japan (JPN)  Language: JAPANESE (JA)
Thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

Semi thesaurus term:
Thesaurus term/Semi thesaurus term
Keywords indexed to the article.
All keywords is available on JDreamIII(charged).
On J-GLOBAL, this item will be available after more than half a year after the record posted. In addtion, medical articles require to login to MyJ-GLOBAL.

JST classification (2):
JST classification
Category name(code) classified by JST.
Production engineering in general  ,  Inventory control 
Terms in the title (3):
Terms in the title
Keywords automatically extracted from the title.

Return to Previous Page